Skip to content

How to read a Dokimion report

A report is built to be read in this order: the score tells you where you stand, the findings tell you what to change, the positions tell you how to place the part.

SectionWhat it showsHow to use it
Kolesar Scorea number from 0 to 100 and a letter from A to EA and B mean the part prints with few or no changes, C to E mean change something first. See how it is built
Score componentsthe three or four measures behind the number, each from 0 to 100the lowest component is the first thing to fix
Conclusiona short written verdict and the most important finding firstread it as a summary, not as a replacement for the findings
Dimensions, volume, massthe size of the part in the position it was sent, and its volume and masscheck that the units are right before anything else
Findingseach problem or point to watch, with numbersa problem should be fixed before printing, a point to watch should be checked
Positionsthe three best placements on the build plate, with a picturecompare support volume, height and the area under support, see orientation
Thresholds and sourcesevery limit used, with its source or marked as an assumptionthis is what makes the numbers checkable
Costestimate per piece for 1, 10 and 100 piecesuse it to compare technologies, see how it is estimated

When the check cannot finish

If part of the check does not finish, the report says so in words, shows no substitute numbers, marks the score incomplete and caps it at 79. A button offers to try again. Nothing is shown as a result when it was not calculated.

What the report is not

It is an assessment for a decision and for a conversation with a service bureau. It is not final production documentation. When a part is expensive, load bearing or going into series, an engineer review adds a signed comment and a 30 minute call.

Get a report for your part
Check a part

Last updated:

Related